Central Asia

Central Asia: Our main Clients
Scope of supply | Name of projects | Year | Client | Location |
No 1 Thermophysical Deaerator Q = 46 T/h |
Hydrogen Production Plant Pavlodar Petroch. Unit |
’06 | KOCH GLITSCH AS | KAZAKISTAN |
No 1 Thermophysical Deaerator Q = 10.3 T/h |
Hydrogen Production Plant Pavlodar Petroch. Unit |
’06 | KOCH GLITSCH AS | KAZAKISTAN |
Thermophysical Deaerator Q = 530 T/h |
Second generation project Tengizchevroil |
’04 | PFD / FAI | KAZAKISTAN |